Buyer Tips · Relocating · Southwest Wake County
How Did the 540 Extension Change Getting Around Holly Springs, Apex and Fuquay-Varina?
Since September 25, 2024, Toll NC 540 has run 18 miles past the NC 55 Bypass in Apex to I-40 near Garner, adding interchanges at Holly Springs Road, Bells Lake Road, US 401, Old Stage Road and NC 50. Holly Springs and Fuquay-Varina now have a direct toll-road route north to Cary and RTP, and east to I-40.
If you last looked at Southwest Wake before late 2024, the road map has changed, and it changes how you should test a commute from a home you're considering. Here's what opened, what it costs to use, what's still coming, and how I'd factor it into a home search. I'm sticking to what NCDOT and the NC Turnpike Authority have published. Drive times vary too much by address and hour to quote a single number.
What exactly opened in Southwest Wake?
The NC Turnpike Authority opened Complete 540 Phase 1 to traffic on September 25, 2024. It's a six-lane, 18-mile extension of the Triangle Expressway, running from the NC 55 Bypass in Apex to the I-40/I-42 interchange in Garner. NCDOT built it in three sections: NC 55 Bypass to east of Pierce Olive Road, then on to US 401, then US 401 to I-40.
According to the Turnpike Authority's quarterly operations report, the new section has five interchanges: Holly Springs Road, Bells Lake Road, US 401, Old Stage Road and NC 50. US 401 is the highway that runs through Fuquay-Varina, so that interchange is the Fuquay-Varina corridor's link to the expressway.
How does it connect to the rest of the Triangle?
The extension joins the older Triangle Expressway, which NCDOT describes as North Carolina's first modern toll road. Today the whole expressway runs 36.8 miles. North of the NC 55 Bypass, Toll NC 540 has interchanges at Veridea Parkway, South Salem Street and US 1 in Apex, and at US 64, Green Level West Road, Morrisville Parkway, NC 55 and NC 54, where the toll road ends in western Cary. Toll NC 885 links it to I-40 near Research Triangle Park, with interchanges at Hopson Road and Davis Drive.
For a buyer, that means a home near the Holly Springs Road, Bells Lake Road or US 401 interchanges now sits on one continuous toll road that reaches western Cary and RTP. It also gives Holly Springs and Fuquay-Varina a direct expressway route east to I-40 near Garner.
The 540 extension didn't move any town closer to RTP. It gave more Southwest Wake addresses a choice between a toll road and the old local routes.
What does it cost to drive Toll NC 540?
The road uses all-electronic tolling, with no booths. You pay one of two ways: with an NC Quick Pass prepaid account, or by an invoice mailed to the vehicle's registered owner. NCDOT says NC Quick Pass gives a 50% discount off the toll invoice rate.
At the extension's one-year mark, NCDOT reported that the average trip on the new section cost $2.49 for NC Quick Pass customers, and that more than 70% of Triangle Expressway drivers had an NC Quick Pass or comparable account. Your cost depends on where you get on and off. NCDOT's toll rate page and NC Quick Pass toll calculator will price your exact route.
If you'll use the expressway twice every workday, run the math for a full month and treat it as part of your housing budget, alongside your mortgage, taxes and insurance.
What's still under construction?
Complete 540 Phase 2 will extend the Triangle Expressway another 10 miles, from I-40 in Garner to the existing I-540/I-87/US 64/US 264 interchange in Knightdale, closing the 540 loop around Raleigh. Construction started with a May 2024 groundbreaking, and NCDOT anticipates opening in 2028. NCDOT estimates the full Complete 540 project at about $2.5 billion.
Until Phase 2 opens, trips from Southwest Wake toward east Raleigh, Knightdale or Wake Forest still leave the expressway at I-40 and continue on other highways.
How should you factor 540 into a home search?
- Test the real commute. Drive it from the actual address at the hours you'd travel, both on the toll road and on the free local route, before you write an offer.
- Price the tolls. Use NCDOT's toll calculator for your entry and exit points, and multiply by your real trip count.
- Visit at different times of day. If a home backs up to the expressway or sits near an interchange, go on a weekday morning and a weekend afternoon to hear and see it for yourself.
- Check planned road projects. NCDOT's State Transportation Improvement Program lists planned and funded projects. Wake County's iMAPS shows a parcel's location against roads.
- Think about resale. Easy expressway access matters to many buyers, and so do quiet streets. Which side of that tradeoff a home falls on is worth weighing for both your daily life and your eventual sale.
The towns along the new section are also where much of Southwest Wake's new construction has been. In the 12 months to October 26, 2026, homes built in 2025 or 2026 were 30.6% of qualified single-family sales inside Fuquay-Varina and 23.9% inside Holly Springs, according to Wake County records. If you're comparing new neighborhoods, the interchange you'd use daily is worth adding to your list.
For more on each town, see my guides to living in Holly Springs and living in Fuquay-Varina. For neighborhoods right at the Apex–Holly Springs line, my Woodcreek guide covers a community in Holly Springs with Apex 27539 mailing addresses, near NC 540 and US 1. You'll find more tips in my commutes and getting around relocation page.
Toll rates, construction schedules and interchange details change. Confirm current information with NCDOT and the NC Turnpike Authority before relying on it for a decision. This article doesn't estimate drive times, which depend on your address, route and time of day.
Sources:
- North Carolina Department of Transportation. "Triangle Expressway Extension Opens to Traffic" (press release, Sept 25, 2024). www.ncdot.gov
- North Carolina Department of Transportation. "Celebrating One Year of the Triangle Expressway Extension" (press release, Sept 25, 2025). www.ncdot.gov
- North Carolina Department of Transportation. "Triangle Expressway" (NC Turnpike Authority project page, updated May 13, 2026). www.ncdot.gov
- North Carolina Department of Transportation. "Complete 540" (project page, updated Jan 22, 2026). www.ncdot.gov
- NC Turnpike Authority. "Triangle Expressway Q2 2026 Operations Report" (board meeting, Aug 20, 2026). www.ncdot.gov
- Wake County Tax Administration. "Qualified Sales, Past 24 Months" (file stamped Oct 31, 2026; sales through Oct 26, 2026). www.wake.gov
Weighing commutes from different towns?
I can help you compare neighborhoods by how you'll actually get around, so your home search starts with the routes that matter to you.
Find your best-fit neighborhoodFrequently Asked Questions
When did the NC 540 extension to Holly Springs open?
Complete 540 Phase 1, the 18-mile Triangle Expressway extension from the NC 55 Bypass in Apex to I-40 near Garner, opened to traffic on September 25, 2024.
What are the 540 exits near Holly Springs and Fuquay-Varina?
The extension's interchanges are Holly Springs Road, Bells Lake Road, US 401, Old Stage Road and NC 50, according to the NC Turnpike Authority. US 401 is the Fuquay-Varina corridor's connection.
How much does it cost to drive the new section of NC 540?
NCDOT reported that the average trip on the extension cost $2.49 for NC Quick Pass customers in its first year. Mailed toll invoices cost more, since NC Quick Pass gets a 50% discount off the invoice rate.
When will the 540 loop around Raleigh be finished?
Phase 2, a 10-mile extension from I-40 in Garner to I-87 in Knightdale, is under construction, and NCDOT anticipates it opening in 2028.